Skip to product information
1 of 39

GreenCampGear

25 Gallon Gold Spot Sprayer | Prime Pump (60 PSI)

25 Gallon Gold Spot Sprayer | Prime Pump (60 PSI)

Regular price $403.50 USD
Regular price Sale price $403.50 USD
Sale Sold out
Shipping calculated at checkout.
Quantity
✓ Shipping shown at checkout✓ Secure checkout✓ Order support

- 25-GALLON TANK: UV-resistant, corrosion-proof polyethylene tank features a low-profile design for stability on ATVs and UTVs. Includes molded-in gallon markers, easy-access drain port and 5" tank lid with lanyard for easy filling - POWER PERFORMANCE: Industrial Self Priming 12V diaphragm pump delivers 2.2 GPM at 60 PSI. Provides the consistent pressure required to penetrate dense brush and pastures, ensuring herbicides achieve total saturation in one pass for maximum efficiency. - VERSATILE SPRAYING: Deluxe Handgun with adjustable nozzle that gives you the flexibility to switch from a concentrated narrow stream for pinpoint distance targeting to a wide-angle fan for rapid, broad-acre coverage. - 15FT LONG HOSE: Heavy-duty 15-foot and 3/8 diameter handgun hose provides maximum reach for fence lines and hard-to-access areas. High-pressure construction prevents kinking and maintains steady flow rates. - UNIVERSAL FIT: Compatibility with ATV racks, UTV beds, and trailers. Ideal for herbicides, pesticides, fertilizers and more to fence lines, pasture, food plots, commercial lanscaping, and large property weed control - TRUST AG SPRAY EQUIPMENT: MADE IN USA. Designed for durability, field-tested for performance. This sprayer is built for landowners, farmers, and pros who demand dependable results every time

Product description

Ag Spray Equipment 25 Gallon Spot Sprayers

High-Performance 12V SHURflo Pump

Equipped with a high?flow 12V pump delivering up to 2.2 GPM to maintain consistent pressure and smooth spraying performance with 100 P.S.I.

Shipping & delivery

Shipping rates are calculated and displayed at checkout. Processing times and delivery estimates are available in our Shipping Policy.

Returns & support

Questions about an item or order? Our support team is here to help. Please review our Return Policy for complete eligibility and timing details.

Why GreenCampGear

We bring together practical outdoor finds for campsites, gardens, patios and everyday life outside.

View full details